Skip to main content
Energy / Grid

Systems engineering for the grid edge

NERC CIP compliance, IEEE 1547 interconnection, reliability engineering, and substation commissioning for grid and power systems.

7 lifecycle phases
40 auto-seeded gate criteria
12 SysML stencil blocks
13 project templates
Methodology

From concept to COD in one platform

New energy projects are seeded with the 7-phase lifecycle — from Concept through Interconnect, Design, Reliability, Build, Commissioning, and Operations. 40 readiness criteria cover NERC TPL/CIP, IEEE 1547 interconnection, IEEE 693 seismic, and IEEE 80 grounding.

1
Concept
Concept & Feasibility
2
Interconnect
Interconnection Study
3
Design
Requirements & Design
4
Reliability
Reliability Analysis
5
Build
Procurement & Construction
6
Commissioning
Commissioning
7
Operations
Operations & Maintenance
What's Included

Everything projects in your industry actually need

📋

Stage Gates Out-of-the-box

40 readiness criteria auto-seeded on every new project. No blank-page starts.

🧱

Native MBSE Stencils

SysML palette with 12 blocks specific to your domain — drop and go.

🎯

Project-type Templates

13 archetypes pre-configured so you start from the right place.

🤖

AI-assisted, Domain-aware

Our AI advisor knows NERC CIP / IEEE 1547 — not generic SE. Prompts, references, and deliverables frame themselves correctly.

Built for

Project archetypes we support

☀️
Solar PV Plant
Utility-scale or distributed solar PV generation
🔋
Battery Storage (BESS)
Grid-scale battery energy storage — frequency regulation, arbitrage, peaker
🔆
Solar + Storage
Co-located solar PV + battery storage (DC-coupled or AC-coupled)
🏭
Substation
New substation or major rebuild (distribution, transmission, switching)

Your first industry pack is free.

Every subscription includes one vertical pack at no extra cost. Add Energy / Grid today — $0 for your first pack, forever.