🛰️Aerospace
SMAD 8-phase · Mission / Phase Gate
Spacecraft mission engineering from concept to disposal. Mass / power / ΔV / link / thermal budgets, orbit propagation, and every SMAD review gate.
- Orbit propagation & coverage
- Subsystem sizing (ADCS, EPS, thermal, RF)
- SRR → PDR → CDR → TRR → FRR → ORR → DR gates
- Launch vehicle selection + ground contact
- Hi-fi propagator + cislunar mission design
104 gate criteria50 calculatorsPack #1 free · $249/mo after
🛡️Defense MBSE
DoD 5000.02 · Program / Milestone Review
DoD 5000.02 Adaptive Acquisition Framework with JCIDS, APB, TEMP, RMF, CMMC, DoDAF, and KPP traceability — built for acquisition programs that answer to auditors.
- JCIDS register (KPP / KSA / APA) with operational-test trace
- APB tracker with Nunn-McCurdy breach classification
- TEMP builder (DT&E / OT&E / LFT&E / cyber T&E)
- KPP trace matrix — JCIDS → Requirements → V&V → TEMP
- RMF / ATO package (FIPS 199 → NIST 800-53 → POA&M → ConMon)
- CMMC Level 1/2 tracker with annual affirmation + C3PAO export
- DoDAF 2.02 viewpoint browser (52 views, approval workflow)
- CDRL / SDRL manager with overdue flagging
- Threat model (STRIDE / PASTA / MITRE ATT&CK)
- MDD → MSA → MS A/B/C → FRP → IOC → FOC gates
58 gate criteria12 calculators$149/mo as pack #2+
⚡Energy / Grid
NERC + IEEE · Project / Stage Gate
Generation, storage, transmission, and substation programs — with dedicated workflows for every NERC standard, IEEE study, and ISO-market obligation.
- Engineering studies: Protection Coordination · Arc Flash (IEEE 1584) · Grounding (IEEE 80) · Ride-Through (IEEE 2800 / FERC 901)
- NERC reliability: FAC-008 · TPL-001 · PRC-005 · CIP-014 · MOD-032/033
- NERC CIP tracker (CIP-002 through CIP-013)
- Outage Management (GADS EFOR / EAF rollup)
- ISO market participation (PJM / ERCOT / CAISO / MISO / NYISO / ISO-NE / SPP)
- PPA / offtake tracker with monthly guarantee-vs-actual + LD exposure
- Environmental compliance (13 permit types, recurring-report calendar)
- LCOE / capacity factor / NPV calculator with scenario compare
- Grid interconnect (SIS / FIS / LGIA)
- Substation commissioning (FAT / SAT / P2P / protection / integrated)
- 54 starter requirements, 35 SysML blocks, 18 project archetypes
45 gate criteria26 calculators$99/mo as pack #2+
⚕️Medical Device
IEC 62304 + ISO 14971 · Device / Design Review
Software-in-device lifecycle for SaMD + embedded: IEC 62304, ISO 14971 hazard file, 21 CFR 820.30 DHF, and 510(k) predicate search.
- ISO 14971 hazard analysis (5×5 residual matrix)
- DHF builder (20 sections, 21 CFR 820.30)
- SOUP register with CVE / NAL tracking
- 510(k) predicate search + SE comparison
- Planning → Requirements → Architecture → … → PMS
53 gate criteria8 calculators$149/mo as pack #2+
🏦Banking / Fintech
SR 11-7 · DORA · SOX · Model / Validation Gate
Model risk management + ICT resilience for banks, fintechs, broker-dealers, and insurers under SR 11-7, DORA, Basel, SOX, BSA/AML, FFIEC.
- SR 11-7 model risk inventory + tier
- DORA ICT resilience + TLPT
- Basel III capital + market risk
- SOX ITGC / CFR 404 controls
- BSA/AML + KYC
- FFIEC / OCC exam prep
27 gate criteria18 calculators$199/mo as pack #2+
🚗Automotive
ISO 26262 · 21434 · SOTIF · ASPICE · Program / Gate Review
Functional safety + cybersecurity for OEMs and Tier 1s under ISO 26262 + ISO/SAE 21434 + ISO 21448 SOTIF + Automotive SPICE + UN R155/156.
- ASIL decomposition + HARA
- ISO 21434 TARA + cybersecurity case
- SOTIF scenario coverage
- ASPICE SWE.1-5 process
- UN R155/156 CSMS + SUMS
- ALKS R157 + IATF 16949 + APQP/PPAP
28 gate criteria20 calculators$179/mo as pack #2+
🚆Rail
CENELEC EN 50126 · 50128 · 50129 · Project / Phase
Railway signaling + rolling-stock + infrastructure to CENELEC + ERTMS + PTC + FRA CFR 49 + APTA.
- EN 50126 RAMS
- EN 50128 SIL 0-4 SW
- EN 50129 safety case
- ERTMS / ETCS / L1-L3
- PTC / ITCS / CBTC
- FRA 49 CFR Parts 213-272
- TSI / ISA / IHA
26 gate criteria16 calculators$149/mo as pack #2+
☢️Nuclear
10 CFR 50 · NQA-1 · IEEE 603 · Plant / Licensing Gate
NRC licensing lifecycle for LWR, SMR, advanced reactors: 10 CFR 50/52, NQA-1, IEEE 603, Reg Guide 1.174, NEI 08-09, ASME Section III.
- 10 CFR 50/52 licensing
- NQA-1 QA program
- IEEE 603 I&C / Class 1E
- PRA Level 1/2/3
- ASME Sec III pressure boundary
- RG 1.174 risk-informed
- NEI 08-09 cyber
28 gate criteria14 calculators$199/mo as pack #2+
💊Pharma / Biotech
21 CFR 211 · ICH · Part 11 · Product / Quality Gate
Drug + biologic + CGT product lifecycle — cGMP, ICH Q7-Q12, ICH E6(R3) GCP, 21 CFR Part 11, CSV, Annex 1 sterile, FDA / EMA / PMDA submissions.
- 21 CFR 211 cGMP
- ICH Q7-Q12 quality
- Part 11 / CSV / GAMP 5
- GCP E6(R3)
- Annex 1 sterile mfg
- APR/PQR + stability ICH Q1
- FDA IND/NDA + EMA MAA
30 gate criteria18 calculators$199/mo as pack #2+
⛽Oil & Gas
API · IEC 61511 · PSM · Asset / Turnaround Gate
Upstream + midstream + refining + LNG under API, ASME B31.3, IEC 61511 SIS, OSHA PSM, EPA RMP, and emission regulations.
- API 510/570/653 inspection
- API 6A wellhead / API Q1
- IEC 61511 SIL / SIF
- OSHA PSM 14-element
- EPA RMP + NSPS OOOOa methane
- API 754 process-safety KPIs
- BSEE SEMS + API 754
26 gate criteria16 calculators$179/mo as pack #2+
⚓Maritime
IMO · IACS · USCG · Vessel / Survey Gate
Vessel design + shipyard + operator compliance under IMO SOLAS/MARPOL/STCW/ISPS/BWM, IACS CSR + URs, USCG CFR 46, + DNV/ABS/LR class.
- IMO SOLAS / MARPOL / STCW
- ISM + ISPS Code
- IACS URs + CSR
- USCG 46 CFR inspection
- BWMS + MARPOL Annex VI
- EEXI / CII / EU ETS maritime
- MLC 2006 seafarer
26 gate criteria14 calculators$149/mo as pack #2+
💧Water / Wastewater
EPA SDWA · CWA · AWWA · AWIA · Utility / Project Gate
Drinking-water + wastewater utilities under SDWA, CWA, AWIA, AWWA standards, Ten States Standards + lead service line inventory.
- SDWA + LCRR lead service line
- CWA NPDES + pretreatment
- AWIA §2013 RRA + ERP
- Ten States Standards
- AWWA G200/G400/G500
- CUPSS asset mgmt
- GWR + SWTR disinfection
24 gate criteria14 calculators$99/mo as pack #2+
📡Telecom
FCC · 3GPP · O-RAN · NENA · Network / RAN Gate
Mobile + fixed + broadband + satcom carriers under FCC Part 15/22/24/25/27/90, 3GPP 5G/6G, O-RAN, NENA 911, ITU-R.
- FCC Part 15/22/24/25/27/90
- 3GPP 5G NR + LTE + 6G
- O-RAN / Open RAN
- NENA 911 / i3 / TDMA
- ITU-R filing + spectrum
- IEEE 802.11/15/16
- CBRS / CPI / SAS
24 gate criteria18 calculators$149/mo as pack #2+
🏗️Construction
OSHA 1926 · IBC · ACI · AISC · NFPA · LEED · Project / Inspection Gate
Commercial + industrial + infrastructure projects under OSHA 1926, IBC + IBC Appendix, ACI 318, AISC 360, NFPA, ASCE 7, ADA, LEED.
- OSHA 1926 Subparts
- IBC + IFC + IRC
- ACI 318 concrete
- AISC 360 steel
- NFPA 13/25/70
- ASCE 7 loads + seismic
- LEED v4.1 + WELL + Fitwel
- ADA accessibility + FHA
26 gate criteria18 calculators$99/mo as pack #2+
⚛️Chemical Mfg
TSCA · REACH · PSM · RMP · CCPS · Substance / PHA Gate
Chemical + specialty + petrochem manufacturers under TSCA, REACH, OSHA PSM 1910.119, EPA RMP 40 CFR 68, CCPS + IEC 61511 SIS.
- TSCA PMN / CDR / inventory
- EU REACH registration
- OSHA PSM 14-element + PHA
- EPA RMP Program 1/2/3
- CCPS RBPS 20-element
- IEC 61511 SIS + SIL
- GHS + OSHA 1910.1200 HazCom
26 gate criteria16 calculators$179/mo as pack #2+
🔌Semiconductor
SEMI · JEDEC · ISO 14644 · ESD · CHIPS Act · Product / Tapeout Gate
IC design-to-production fabs + fabless + OSAT under SEMI S2/S8/S14, JEDEC qualification, ISO 14644 cleanroom, ESD S20.20, CHIPS Act.
- SEMI S2 / S8 / S14 equipment safety
- JEDEC JESD22 / JESD47 qual
- ISO 14644 cleanroom Class 1-9
- ANSI/ESD S20.20
- CHIPS Act compliance
- AEC-Q100/200/300 automotive
- IPC + J-STD + ISO 26262
26 gate criteria16 calculators$199/mo as pack #2+
🏛️Insurance
NAIC · ORSA · RBC · Solvency II · IFRS 17 · Carrier / Filing Gate
P&C, Life, Health + reinsurance carriers under NAIC RBC + ORSA, Solvency II SCR, IFRS 17, ASOP, MCAS, SERFF filings.
- NAIC RBC + ORSA
- Solvency II SCR / MCR
- IFRS 17 CSM / LRC / LIC
- ASOP actuarial opinion
- MCAS market conduct
- SERFF rate/form filings
- NAIC IDSLMA cyber
26 gate criteria18 calculators$179/mo as pack #2+
⛏️Mining
MSHA 30 CFR · SMCRA · OSMRE · GISTM · Mine / Permit Gate
Coal + metal/non-metal + industrial minerals under MSHA 30 CFR Parts 46-77, SMCRA + OSMRE permits, GISTM tailings, NPDES, ICMM.
- MSHA Parts 46-48-56-57-75-77-70
- SMCRA / OSMRE permit + bond
- BLM / Forest Service POO
- GISTM TSF surveillance
- NPDES + CAA NESHAPs
- Blasting + methane control
- ICMM 10-principle sustainability
27 gate criteria18 calculators$149/mo as pack #2+
🌾AgTech / Food
USDA · FDA FSMA · EPA FIFRA · HACCP · GFSI · Operation / Phase Gate
Farm + food processor + importer under FSMA PCHF/Produce/FSVP/Sec 204, USDA FSIS/Organic/APHIS, EPA FIFRA/WPS, GFSI (SQF/BRC/FSSC).
- FSMA PCHF + Produce + FSVP
- FSMA Sec 204 traceability
- HACCP 7-principle
- USDA FSIS / Organic 7 CFR 205
- EPA FIFRA + WPS + MRLs
- GFSI SQF / BRC / FSSC 22000
- Animal Welfare Act + precision ag
27 gate criteria20 calculators$149/mo as pack #2+
🏛️GovTech / Public Sector
FedRAMP · FISMA · NIST 800-53 · CMMC · FAR/DFARS · System / ATO Gate
CSPs, contractors, federal + SLTT under FedRAMP Low/Mod/High, FISMA ATO, NIST 800-53r5 + 800-171/172, CMMC L1/2/3, FAR/DFARS 7012, CISA BODs, StateRAMP, CJIS, IRS 1075.
- FedRAMP SSP + SAR + POA&M
- FISMA ATO / RMF 6-step
- NIST 800-53r5 + 800-171 + 800-172
- CMMC L1/2/3 + SPRS
- FAR clauses + DFARS 252.204-7012
- CISA BODs + VDP + Privacy Act/PIA
- StateRAMP + CJIS + IRS Pub 1075
29 gate criteria20 calculators$199/mo as pack #2+
📐Generic SE
INCOSE V / ISO 15288 · Project / Phase Gate
Domain-neutral INCOSE V-model baseline. Requirements, risks, reviews, and phase gates without industry-specific calculators. Free fallback.
- INCOSE V-model 8 phases
- Stakeholder needs → system requirements
- Trade studies + margin tracking
- V&V matrix + verification tracking
- Integration → Transition → Operation
34 gate criteria0 calculatorsFree fallback · always included