NRC licensing + NQA-1 + PRA, in one platform
NRC 10 CFR 50 / 52 / 53 reactor licensing, NQA-1, IEEE 603, NUREG-0800 Standard Review Plan, RG 1.168 SW V&V, 10 CFR 50 Appendix B. Built for LWRs, SMRs, advanced reactors, license-renewal, fuel-cycle facilities, and decommissioning programs.
10 CFR 50 · 52 · 53 · NQA-1 · IEEE 603 · NUREG-0800
Every nuclear program runs through the same 8-phase lifecycle — Concept / Siting, Licensing Basis, Safety Analysis, Design, Construction, Startup, Operations, Decommissioning. 30+ gate criteria cover 10 CFR 50 / 52 / 53 reactor licensing, NQA-1 quality, IEEE 603 safety systems, NUREG-0800 Standard Review Plan, RG 1.168 SW V&V, 10 CFR 50 Appendix B, PRA per ASME/ANS RA-S, and 10 CFR 50.59 change control. Built for LWRs, SMRs, advanced reactors, license-renewal, fuel cycle, and decommissioning.
Everything programs in your industry actually need
Gates Out-of-the-box
34 readiness criteria auto-seeded on every new program. No blank-page starts.
Native MBSE Stencils
SysML palette with 18 blocks specific to your domain — drop and go.
Program-type Templates
18 archetypes pre-configured so you start from the right place.
AI-assisted, Domain-aware
Our AI advisor knows 10 CFR 50 / NQA-1 — not generic SE. Prompts, references, and deliverables frame themselves correctly.
Program archetypes we support
Every tool your program needs, shipping today
Every regulatory requirement, PRA output, Tech Spec LCO, and NQA-1 audit gets a dedicated page. Full doc-gen (SAR / FSAR, 50.59 Evaluation, PRA Summary, NQA-1 Audit, Tech Specs) — no more CAPS / Palladium / bespoke monstrosities.
Licensing 10 CFR 50 / 52 / 53 · SAR / FSAR · Tech Specs
Every licensing artifact, aligned with the Standard Review Plan. From ESP to COL to ongoing 50.59 screenings.
Safety Analysis PRA · ECCS · IEEE 603
The nuclear safety argument — Level 1 / 2 / external-events PRA + deterministic backstop.
Quality (NQA-1) NQA-1 · Appendix B · CGD · RG 1.168 SW V&V
The quality argument. Not "we have a QA manual," but "here is every audit, finding, and CGD packet.".
Plant Programs Maintenance Rule · SBO · Fire · EQ · Security · EP
The ongoing plant-program lifecycle. Every program tracked with findings, exercises, and evidence.
Decommissioning Funding · PSDAR · License Termination
The post-operation lifecycle — from 50.75 funding assurance to site release.
Depth 18 starter requirements · 18 SysML blocks · 5 doc templates
Pack ships deep. Starter requirements cover licensing, PRA, NQA-1, Appendix B, CGD, SW V&V, EQ, seismic, Maintenance Rule, SBO, fire, security, EP, decom. SysML palette has Reactor Unit, Core, SG, RCP, ECCS, Class 1E, Containment, RPS, ESFAS, MCR, EDG, SFP. Doc-gen for FSAR, 50.59 Evaluation, PRA Summary, NQA-1 Audit, Tech Specs.
Your first industry pack is free.
Every subscription includes one vertical pack at no extra cost. Add Nuclear today — $0 for your first pack, forever.